Has been able to
Nigerian debt without a maximum of the due (a million bills as the collection continues
Abija, January 2024 – New times indicates Nigeria’s struggle to collect electricity to electors to electors, and Benin Republic and Togo Mode of the final quarter of 2024.
The Nigerian electricity (Nerc) Quarter Mota indicates 37% only of the Invoices provided to the global customer sets, and continue to pay for the world.
World Action World Actions
• Menin Republic-Sceees: 2.65IOUUSTOS • Transcorp-SBEE (UGEELLINE):1.88 a million unpaid
• Sobakani-SIME: $ 2.37 million just going
Gigerream-nigelc stopped as a national customer to respect its workouts $ 2.6 million.
The domestic changes
In front of the house, the forces showed a gentle progress:
• 77.44% (₦ 509.84 billion of ₦ 658.4 billion)
• 2.89% off the previous quarter
However, uncontrollable payments continue:
• AJakata’s Ajaka
• A number of bilateral customers carry the front
The difficulties of war
Moviegers are highlights a lot of money that was not paid for Nigeria’s Nigeria, which can affect you:
- Grid to fix projects
- The possibility of the stomach industry to pay for the gas station
- Nigeria’s place in the state of use laws
Nerc has reported the Ajirate’s loan to the government officials after contemplating the tight ways of the world’s tights. Commission keeps working with customer helps to be collected in family.
Looking for the future
The report comes as nigeria to re-prepare the formation of the digestive fences, looking for a prominent householder.
Terms of industrialization indicates that nigeria may be required to set a desired way or reduce the amount of money to protect its income. Things reassure effects of powerful electricity plus accordance with global difficulty.
The thoughts are writing: Acoulates 155